Inspection of Izolyator Bushings for National Power Grid of Kyrgyzstan
On 12 July 2018, Izolyator received an inspection of tests of high-voltage bushings, made for the needs of the National Power Grid of Kyrgyzstan, which ended with success.
National Power Grid of Kyrgyzstan is an energy company that transports electric power via ETLs across the entire Kyrgyz Republic to distribution companies and large industrial consumers. National Power Grid of Kyrgyzstan is also a system operator that provides centralized control over the national grid of Kyrgyzstan. The task of National Power Grid of Kyrgyzstan is to transmit power via national 110, 220 and 500 kV power lines to the consumers and control over the network and interstate and republican power flow modes.
The group of NPG’s inspectors included:
- Head of Electrical Service at Talass enterprise of high-voltage electric networks, branch of NPG Kyrgyzstan Zakir Mykyev,
- Lead Engineer of Operation and Maintenance Kadyr Tilenbaev,
- Economist of Purchasing and Logistics Dpt Kumar Abaskanov.
Dmitry Ivanov, Head of Test Center at Izolyator managed the tests.
Head of CIS & Baltics Sales Maxim Osipov and Lead Technical Support Specialist Victor Kiryukhin actively engaged in the inspection procedures.
Discussing results of high-voltage bushings’ test with NPG Kyrgyzstan representatives at the test center of Izolyator plant
The tests went according the schedule and ended in success, proving the high reliability of Izolyator high-voltage bushings and their full conformity to the technical standards.
Participants of inspection of bushings for the needs of NPG Kyrgyzstan at the test center of Izolyator, L-R: Dmitry Ivanov, Maxim Osipov, Head of Electrical Service at Talass enterprise Zakir Mykyev, Lead Operation and Maintenance Engineer at NPG Kyrgyzstan Kadyr Tilenbaev, Economist of Purchasing and Logistics Dpt at NPG Kyrgyzstan Kumar Abaskanov and Victor Kiryukhin
The inspection became yet one more practical step towards development of a fruitful cooperation between the National Power Grid of Kyrgyzstan and Izolyator.