Meeting With Management of Backbone Power Grids of West Siberia
On 22 February 2018, Chairman of the Board of Directors of Izolyator Alexander Slavinsky met management of Backbone Power Grids of West Siberia in Surgut, Tyumen region.
Backbone Power Grids of North West (MES North West) is a branch of FGC UES PJSC operating on the territory of the North-Western Federal District. The service area includes 11 Subjects of Russian Federation with a population of 14 mln people. MES North West is responsible for uninterruptible operation of more than 14 thnd km of power lines and 99 substations with total transformer capacity over 38.7 MVA. The branch ensures electric connection of the unified energy system of North West with the power systems of Central Russia, Belarus and interchange to Finland, Estonia and Latvia.
Alexey Maltsev, General Director at MES West Siberia, branch of FGC UES PJSC, received the guest.
The sides discussed technical trends in development and production of high-voltage equipment, common targets and strategy of long-term cooperation, successful experience and measures to raise efficiency of practical interaction as well as prospective projects.
The sides marked the exceptional productivity and expressed satisfaction with the results of the talks.
Alexander Slavinsky (L) and General Director of MES West Siberia, branch of FGC UES PJSC, Alexey Maltsev
We appreciate MES West Siberia for their invitation and a fruitful cooperation!