Meeting in Kubanenergo
On 4 July 2017, Izolyator representatives visited Kubanenergo grid company in Krasnodar.
Kubanenergo is the largest grid company of the Krasnodar region and the Republic of Adygea that transfers and distributes electricity through 0.4–110 kV networks. The service territory of the company makes 83 thnd sq km with a total population of 5.5. mln people. Kubanenergo PJSC is a daughter company of Rosseti PJSC.
Alexander Slavinsky, Chairman of the Board of Directors and Oleg Bakulin, Director of Partner Relations represented the plant.
On Kubanenergo side the guests were received by:
- Igor Shishigin, Chief Engineer;
- Andrey Chebakov, Deputy Chief Engineer;
- Grigory Masin, Chief, Diagnostics.
The agenda concentrated around discussion of the Power electric equipment development till 2030 roadmap in respect to high-voltage bushings.
Besides, Kubanenergo representatives shared their successful experience of Izolyator high-voltage bushings operation in the power grid.
The sides expressed intention to actively develop joint activities.
Alexander Slavinsky (L) and Grigory Masin by the head office of Kubanenergo
We appreciate Kubanenergo PJSC for their invitation and a fruitful cooperation!