Report on Izolyator’s Results in Quality Management and Interactions With Operators of Equipment
On 11 February 2019, a meeting on quality issues where Izolyator summarized results in quality management and interaction with operating companies was held at the company.
This annual meeting serves as a starting point for organizing a systematic, targeted and regular work of Izolyator on product quality improvement and interaction with operators of equipment.
The top management of the company, headed by Chairman of the Board of Directors Alexander Slavinsky, listened to reports.
Report on the company’s results in quality management and interactions with operators of equipment
Quality Director Alexander Novikov in his report informed the colleagues about the progress of quality assurance program in 2018 and spoke about the results over the reporting period.
Among the most important news of the year was the purchase and commissioning of equipment that enhances capabilities of Izolyator plant’s test center: 1200 kV pulsed voltage generator and spray test unit for electrical equipment.
In 2018, Izolyator received a compliance certificate from Rosenergoatom Concern. The company received a successful recertification audit of quality management system for conformity to the international standard ISO 9001:2015, certification audit of the system of ecological management for conformity to ISO 14001:2015, audit of labor safety and protection for conformity to OHSAS 18001:2007.
The largest part of that report was dedicated to quality indicators analysis.
Alexander Novikov is telling about the progress of quality assurance program in 2018
The Head of SVN-Service Dmitry Mashinistov made a presentation about the results of interaction with equipment operators in 2018.
The staff of SVN-Service provides a high quality technical support, diagnostics, warranty and post-warranty service of Izolyator bushings at any power facilities, including Russian and foreign NPPs.
Over the reporting period, the team commissioned 75 high-voltage bushings including the first in Belarus 750 kV RIP bushing installation.
The audience of the meeting to summarize the results of quality management and SVN-Service operations — staff members of Izolyator
The staff members took an active part in workshops and industry-related events in Russia and abroad. Those were technical seminars for the specialists of the state utility EVN National Power Transmission Corporation and Dong Anh Electrical Equipment Corporation transformer plant in Vietnam, seminar for management representatives and technical specialists of branches of the Mogilyov republican unitary enterprise of power industry Mogilyovenergo in Belarus, workshop for technical specialists of the State Electrosystem of Georgia, seminar for management and specialists of Interregional Distribution Grid Company of North Caucasus divisions in Pyatigorsk, the fifth anniversary scientific seminar “Fault-free transformer 5.0. The scientific fundamentals and practical solutions that work” in Nizhny Novgorod.
Dmitry Mashinistov is reporting about the results of cooperation with operating organizations in 2018
In conclusion of their speeches, the reporters presented their work plans in quality management and interaction with operating companies in 2019.