Talks at Main Power Systems of East
On 23 October 2019, Director of Strategic Sales at Izolyator plant Alexander Savinov had talks at the Main Power Systems of East in Khabarovsk.
Main power system of the East (MPS East) operates in the Far-Eastern Federal District. There are five federal subjects with a population exceeding 5 million people in its service area.
The system provides electric connection between the unified power grid of the East and the power grid of Siberia, and export of power to China.
MPS East is headquartered in Khabarovsk.
MPS East is a branch of FGC UES.
Roman Gudin, Head S/S Equipment received the visitor.
Alexander Savinov (L) and Head S/S Equipment at MPS East Roman Gudin at the head office of the Main Power Systems of East, Khabarovsk
The sides discussed the interim results of collaboration under the existing agreements. Much attention was given to discussing possibility of equipping the power facilities of the company with the high-voltage bushings with internal RIN insulation.
The sides expressed a shared intention to develop cooperation.