Contact us
Working hours: Mon-Thu 8 a.m.- 4:30 p.m.
Fri 8 a.m.- 3:45 p.m.

News

27-30.11.2012
XV International specialized exhibition «Electrical Networks of Russia 2013», Moscow.
07-08.11.2012
XIV Conference «Intellectual electric power industry, automatics and high-voltage switching equipment» of International Association «TRAVEK», Moscow.
23-25.10.2012
III International power industry forum «International Innovation Projects in Grid 2012» (UPGrid 2012). Organizer — Federal Grid Company of United Energy System (FGC UES).
22-23.10.2012
Audit managed by PJSC “Zaporozhtransformator” (ZTR) for quality evaluation of manufacturing of 126–550 kV HV bushings for power transformers and reactors.
18.10.2012
Technical seminar at Kentau transformer plant JSC «Alageum Electric», Kazakhstan
17.10.2012
Technical seminar at «UzhKaz Energoremont Co. Ltd», Chimkent city, Kazakhstan.
16-19.10.2012
XVIII International specialized exhibition «Urals Energy» under the aegis of XII Russian Energy Forum, Ufa city.
01.10.2012
Five year prolongation of recommendations for application of 330 and 550 kV bushings at FGC UES facilities.
26.09.2012
Technical seminar at Georgian State Electrosystem (GSE), Tbilisi, Georgia.
19.09.2012
Technical seminar at "Moldelectrica" (public enterprise), Ministry of Economy of Republic of Moldova, Kishinev
14.09.2012
Grand opening of “ESCON” factory — energy building constructions, Uzhnouralsk, Chelyabinsk region.
12-13.09.2012
Joint technical-commercial conference between PJSC “Zaporozhtransformator” (ZTR) and Izolyator factory. The Parties have agreed to perform an audit of Izolyator factory in October 2012 aimed at 330-500 kV bushing applic
26.08.2012
Anniversary of Dr. Alexander Slavinsky, Chairman of Board of Directors of Izolyator factory >> interview and greetings
06.08.2012
Visit of delegation from Main Power Grids of the Siberia — branch of Federal Grid Company of United Energy System (FGC UES).
01.08.2012
Visit of delegation from JSC “Fortum”.
29.06.2012
Publication of the article “Results and trends in the technical policy of Izolyator factory” in the “ELEKTRO” magazine, №3/2012
20–22.06.2012
Presentation of Izolyator factory products at JSC “National Power Grids of Kyrgyzstan” (JSC “NPGK”) and JSC “Power Stations”, Bishkek, Kyrgyzstan.
19–20.06.2012
XIII conference «Power and distributive transformers and reactors. Systems of diagnostics» under the aegis of International Association of Business Cooperation on transformers, high voltage equipment, electrical ceramics and other spare pa
22–25.05.2012
The 19th International Specialised Exhibition Energetika & Elektrotechnika, St. Petersburg, Russia.
27.04.2012
Promotion of the new and updated bushings rated at voltage up to 220 kV in “Energopolis” magazine № 4/2012, timed to the corporate presentation day of JSC "Interregional Distribution Grid Company of the North-West".
22.03.2012
General meeting of members of International Association of Business Cooperation on transformers, high voltage equipment, electrical ceramics and other spare parts and materials "TRAVEK" and factory tour at Izolyator.
20–21.03.2012
XII conference «Prospects of development of electric power industry. Energoefficiency and energosaving» under the aegis of International Association of Business Cooperation on transfor
15.02.2012
Visit of delegation from JSC «Kazakhstan Electricity Grid Operating Company KEGOC».
08.02–14.06.2012
Technical seminar for design and operation of the new 220-500 kV bushings in the regional Main Power Grids – branches of Federal Grid Company of United Energy System (FGC UES).