Stan-Komplekt, a joint Russo-Ukrainian venture, is celebrating its 20th anniversary. The partner relationship between Izolyator Company and Stan-Komplekt, which started more than a decade ago, have evolved to a relationship of trust a long time ago. We congratulate Stan-Komplekt with the anniversary and wish them success, steady development and prosperity!
Congratulations to Federal Grid Company of Unified Energy System with 12th Anniversary of Foundation! On 25th of June 2002 FGC UES JSC has been officially registered as a management company of the Unified national power grid. We wish further progress in development of Russian power industry!
Izolyator company. was selected as 2014 year's supplier of high-voltage bushings needed for long-distance electric networks – Federal Grid Company of Unified Energy System branches. We appreciate FGC UES's confidence in Izolyator company who view us as a reliable long-term partner!
Izolyator company page is opened in the social network Linkedin
25.04.2014
Izolyator Company has successfully passed the second compliance audit of its quality management system for conformity to EN ISO 9001:2008. The audit was conducted by the international certification body TUV PROFI CERT, Germany
22.04.2014
Izolyator company opened a corporate page on YouTube
Izolyator company representatives visited Power Machines Toshiba High-Voltage Transformers LLC, St. Petersburg >>photo
26.02.2014
1st deputy CEO — Commercial Director of Izolyator company with a group of colleagues visited transformer plant of Siemens AG concern in Nurnberg, Germany >>photo
25.02.2014
1st deputy CEO — Commercial Director of Izolyator company with a group of colleagues visited transformer plant of Alstom in Aix-le-Bain, France >>photo
24.02.2014
The representatives of Izolyator company visited transformer plant JST transformateurs in Lyon, France >>photo
20.02.2014
Izolyator company representatives visited Ufa transformer plant – subdivision of Elektrozavod holding company >>photo
19.02.2014
Izolyator company took part in the seminar for Bashkortostan power engineering specialists, which was placed in the training complex of Bashkirenergo company, Ufa City >>photo
19.02.2014
Alexander Slavinsky, Chairman of Board of Directors of Izolyator company was elected an full member of the Academy of Electrotechnical Sciences of Russian Federation
11–14.02.2014
Power engineering 2014
12.02.2014
Izolyator company was visited by the representatives of Federal Grid Company of Unified Energy System – the subsidiary of Russian Grids company (Rosseti) >>photo
04.02.2014
General director of the company 3S Green Energy (India) Pvt. Ltd visited Izolyator company >>photo
29.01.2014
Izolyator company was participating at the meeting, arranged by Far Eastern Distribution Company of “RAO Energy System of East” Holding, which was held in Blagoveshchensk City >>photo
28.01.2014
Izolyator company has participated at the technical board of Tyumenenergo — an subsidiary company of Russian Grids company (Rosseti), which took place in Surgut Clty >>photo
23.01.2014
Izolyator company was visited by delegation from Lenenergo — an subsidiary company of Russian Grids company (Rosseti) >>photo
22.01.2014
Izolyator company was visited by the Director of Material Logistics Dept., member of the Central Bidding Commission of Moscow United Electric Grid Company (JSC “MOESK”) — an subsidiary company of Russian Grids company (Rosseti) >>photo
Продолжая использовать сайт mosizolyator.ru вы соглашаетесь на использование файлов cookie.